Former National Route 145 Scheduled to be Submerged After Completion of Yamba Dam free stock photo

Former National Route 145 Scheduled to be Submerged After Completion of Yamba Dam - free stock photo

Cropped materials are also subject to the Terms of Use.

About This Photo

This is a photo material of the former National Route 145 tunnel that is scheduled to be submerged after the completion of the Yamba Dam. The image shows a stone-built tunnel, a paved road, and a sidewalk with handrails. This is recommended for use in web

ID Number
26311
Published Date
Color
Image Size
  • 4333 px × 3250 px

Free Download (No Registration Required)

The photo material of 'Former National Route 145 Scheduled to be Submerged After Completion of Yamba Dam' is free material that can be used for both commercial and non-commercial purposes without charge. No membership registration is required, and there are no quantity limits or paid sales. Please read the "Terms of Use", and only if you agree, you may use the S/M/L and cropped images.

Main usage examples of photo materials include TV telops, blog eye-catch images, YouTube thumbnails, tracing and sketching, presentation materials, etc.